• IR Epoxy 360

    Article No. 687207

    IR Epoxy 360

    Rigid 2K epoxy injection resin, F-I (P)/F-V (P)

    Variant
    6872 | IR Epoxy 360
    Size / Quantity

    Product specifications

    Viscosity (12 °C) 1100 mPa s
    Viscosity (23 °C) 360 mPa s

    Component A

    Density (20°C) 1.1 g/cm³

    Component B

    Density (20°C) 0.94 g/cm³

    Once fully cured

    Flexural tensile strength 53 N/mm²
    Compressive strength 45 N/mm²
    Tensile strength 20 N/mm² dry
    Elongation at break (DIN 52455-A1) 28%
    Adhesive pull strength 4.3 N/mm²
    Shrinkage < 3%

    The stated values represent typical product characteristics and are not to be construed as binding product specifications.

    Field of application

    • For use on floors/walls indoors and outdoors
    • Crack injection in concrete according to DIN EN 1504-5
    • Classification: U(F1) W(2) (1) (8/30) (1)
    • Moisture level: DY
    • Tested according to ZTV-ING (RISS), (BASt List)
    • Tested according to DIN V 18028
    • Frictional bonding and joining of components
    • Strengthening open-pored concrete structures
    • Joining hollow components

    Properties

    • Freeze/thaw resistant
    • High chemical resistance
    • Total solid (Similar to the testing method of Deutsche Bauchemie e.V.)
    • Fire behaviour B2 pursuant to DIN 4102-4
    • Low viscosity
    • Preparation
      • Substrate requirements

        The flanks of the crack must be dimensionally stable and free from loose parts, sintered layers, oils, grease and other separating substances.

      • Preparations

        Plug the path of the crack if necessary.

        Use a suitable packer.

    • Preparation
      • Mixing ratio comp. A 2.5 : comp. B 1
      • Mixing time 3 min
      • Combination container

        Add the entire quantity of the hardener (component B) to the base compound (component A).

        Mix thoroughly with a slow-speed electric mixer
        (approx. 300 - 400 rpm).

        Mix for at least 3 minutes.

        Insufficient mixing is indicated by streaks forming.

        Pour the mixture into a separate container and mix again thoroughly.

    • Application
      • Application temperature: min. 8 °C
      • Working time 100 min
      • Using suitable injection technology, inject the material from bottom to top.

        Remove packer, seal boreholes if necessary.

    • Application instructions
      • Conduct an analysis of the structural condition prior to injection.

        Adjust the injection pressure according to the properties of the building component.

        Conduct any subsequent injection within the working time.

        As a general principle, higher temperatures will reduce and lower temperatures will increase the times stated.

        Significant increase in viscosity at low temperatures.

    • Working tools / cleaning
      • Injection device, hand-lever press, suitable mixing equipment, hammer drill

      • More detailed information can be found in the Remmers Tool Programme.

        Clean tools, equipment and splashed material immediately while fresh with V 101.

        Take suitable protective and waste disposal measures when cleaning.

    • Storage / shelf life
      • Store frost-free and cool / protect for moisture / close containers
      • Shelf-life 12 months
      • If stored unopened in its original container in a cool, dry place and protected against frost, the product will keep for at least 12 months.

    • Usage
      • - To be determined on a case-by-case basis, dependent on the crack width and component thickness
        - Approx. 1.1 kg/l void
        - Approx. 0.4-0.7 kg/running metre

    • General information
      • Unless otherwise specified, all of the values and application rates given above have been determined under laboratory conditions (20 °C). Slight deviations from these values may arise if the product is worked with on site.

        The actual amount of material needed depends on the size of the void. Proceed based on the results of the building condition analysis.
        Remember that surplus material may be needed depending on the application method.

        Once the work is finished, thoroughly empty and clean the injection device.

        The current technical regulations must be observed.

    • Disposal instructions
      • Larger quantities of leftover product should be disposed of in the original containers in accordance with the applicable regulations. Completely empty, clean containers should be recycled. Do not dispose of together with household waste. Do not allow to enter the sewage system. Do not empty into drains.

    • Safety / regulations
      • Further information concerning safety during transport, storage and handling as well as on disposal and ecology can be found in the latest Safety Data Sheet.

    Possible system products

    Tools, accessories and PPE