Coating for windows and wooden components, Building waterproofing and refurbishment, Facade protection and refurbishment

Description

The buildings of "New Holland" have been restored several times over the years and have been repeatedly supplemented with new buildings and extensions. All buildings were damaged inside as well as on the facade and roof. The brick facades in particular, which were heavily soaked through, posed a major problem. In addition, damage to the masonry and the cladding of the plinths was detected. During the restoration of the brick masonry, the varying condition as well as the heterogeneous nature proved to be a particular challenge. There was also high salt content, which could be damaging to the building and therefore had to be reduced. Finally, the aim was to achieve the most harmonious possible colour matching of the stone surfaces.

Category

Heritage conservation

Description

The major fire in the cathedral took a heavy toll on the natural stone masonry. Soot and released pollutants settled on and in the walls, causing damage to them. Cleaning was carried out using a solvent-free, film-binding peel-off paste, which traps the impurities. The layer that forms is then stripped off to remove the particles from the masonry.

Category

Wood coatings, Wood protection, fire protection & wood refurbishment, Coating for windows and wooden components

Description

All the wooden elements needed to have the same final colour, even if they were made from different types of wood by different companies. Working closely with the architect and the building contractor, Remmers coordinated the technical aspects of the coating.

Category

Wood protection, fire protection & wood refurbishment

Description

'

Sustainability played a major role in the choice of materials: The wood for the staircase came from sustainable forestry and the wood waste generated during the construction of the staircase was also reused. The products used were also chosen for their sustainable credentials. At the same time, they also need to withstand the high loads that are exerted on the stairs and floors by numerous visitors over long periods of time.'

Category

Building waterproofing and refurbishment

Description

The new construction of the underwater world and the large aviary in Luisenpark had to be finished with flat roof structures that would provide reliable waterproofing over the long term. Due to the exposed location and the construction-related moisture load, the flat roofs are the part of the building that is subject to the most stress. A flat roof is exposed not only to rainwater, but also to extreme temperature differences, complex structural-physical interactions and mechanical loads, such as stresses caused by expansion, shrinkage and deflection of the structure. The individuality of the roof construction presented planners and contractors with particular challenges when waterproofing the flat roof construction. But a quick and easy solution was found in the form of MB PUReactive+.

Reference

Hagn Winery, Mailberg (AT)

Mailberg

Category

Flooring systems for the food industry, Floor coatings

Description

The Hagn family commissioned the conversion of a former storage depot for the delivery, production and distribution of red and white wine. The project called for the installation of an industrial floor that could meet the hygiene requirements of the food production sector and the loads exerted by the transport vehicles. The decision was taken to use a chemically and mechanically resilient, pigmented epoxy coating that fulfils all the physical and hygienic criteria.

Reference

Millennium Háza, Budapest (HU)

Budapest

Category

Heritage conservation, Facade protection and refurbishment

Description

The Millennium Háza is located in the famous “Városliget” city park in the centre of Budapest. Formerly known as the Olof Palme House, the building was designed by Ferenc Pfaff in 1885 in the Neo-Renaissance style. The building originally served as a venue for art exhibitions. Over the course of the 20th century, it housed the city museum, a sculptor’s workshop, a dance school and various restaurants. After lying vacant for many years, the Millennium Háza underwent restoration between 2017 and 2022.

Reference

Angkor Park, Siem Reap (KHM)

Siem Reap, Kambodscha

Category

Facade protection and refurbishment, Heritage conservation

Description

Numerous sandstone buildings in the park have been damaged or destroyed over the centuries due to peeling, iron crusts and salt exposure. To counteract the exponential progression of weathering, classic and elasticising stone strengtheners were used on the walls, decorative elements and sculptures. With the help of a special binding agent, various additives were used to produce and apply injection compounds, battering mortar and glazes on site.

Reference

Siemens Campus, Erlangen

Erlangen

Category

Car park systems, Floor coatings

Description

In order to withstand the daily stresses and strains of employees’ vehicles, a coating system specially designed for surfaces with heavy traffic loads was applied. The epoxy blinded coating features high chemical and mechanical resilience.

Reference

3D-printed house, Beckum

Beckum

Category

Building waterproofing and refurbishment, Floor coatings

Description

Two solutions were used to waterproof the house. The first step was to seal the ground floor base. This was done from above. The base of the house was then waterproofed from the outside. This protects the substrate of the building from moisture on both sides.

Reference

Precision Micro, Birmingham

Birmingham

Category

Floor coatings

Description

After extensive trials and chemical exposure testing, Remmers resin systems were selected for the works. For the ceiling, Epoxy BS3000 SG provided chemical protection to the galvanised steel surface and exhibited excellent adhesive properties after the steel was prepared using an ice blasting process. The floors were a mixture of existing resin finishes, new concrete and Polypropylene drain covers. A selection of priming solutions for the different areas were utilised including, Epoxy ST100, Epoxy MT100 and Epoxy BS3000 SG. Then topped with Epoxy Flex PH laid at 2mm and sealed with PUR Top M+. Integral coved skirting was installed to all perimeters, 100mm high.