Project Description

An acetic acid loading bay area which required re-screeding with a long term chemically resistant durable screed.

Main Problem and Requirements

Henkel had adopted an expensive periodic recoating of the loading bay area as they had previously been unable to find a suitable chemically resistant screed.

SD1-F was selected for the floor accompanied by SD1-W for the upstands.

Products and Systems Used

SD1-F

SD1-W