Turlough Hill Power Intake Tower, Ireland

//Turlough Hill Power Intake Tower, Ireland
Turlough Hill Power Intake Tower, Ireland 2015-06-05T13:11:55+00:00

Project Description

Completed in 1974 Turlough Hill is Ireland’s only pumped storage station, It generates up to 292MW during peak demand periods by releasing water from its upper reservoir and allowing it to flow through its four turbines into a lower reservoir. During periods of lower demand the water is pumped back to the upper reservoir ready to be used again.

Remmers products were chosen for the below water line protection of the concrete.

Products and Systems Used

Epoxy FAS100

Epoxy Universal

Project Details